Curriculum vitae

Peppy Conrad

Date of birth: 18th August 1957

Address: HASTINGS, UK

Nationality: British

Marital status: Single

Occupation: Civil (Site) Engineer

Northern Lightspeppyc2@yahoo.com

Northern Lights00(44)7774242398

Northern Lightswww.peppysiteengineeringservices.com

Education

1. BRIGHTON TECHNICAL COLLEGE

O.N.D. in Technology (Engineering)

1976-78, BRIGHTON, East Sussex

2. LEEDS POLYTECHNIC

H.N.D. in Civil Engineering

1978-81, LEEDS, West Yorkshire

3. COLUMBIA PACIFIC UNIVERSITY

B.Sc. in Civil Engineering (Correspondence course)

1981-83, BIRMINGHAM, main campus in CALIFORNIA, USA

4. BRIGHTON POLYTECHNIC

Post-graduate Diploma in Management Studies (D.M.S.)

Stage i (full-time): September-December 1983, EASTBOURNE

Stage ii (part-time): April 1985 - April 1986, BRIGHTON

My jobs:

1. WIMPEY CONSTRUCTION (UK) LTD, March - July 1985

Survey assisstant plus some training in drainage and roadworks setting out.

2. CARTER HORSELEY ENGINEERSS (NEI THOMPSON)

2.1 Site Engineer setting out steel bridge girders, South Wales - Ynysforgen river bridge May-July 1986

2.2 Site Engineer setting out steel bridge girders, Evesham-by-pass river bridge Evesham-by-pass river bridge July-August 1986

2.3 Site Engineer setting out steel bridge girders, A406-Contract 3, Barking Viaduct, East London September 1986-March 1987

3. REDPATH DORMAN LONG (TRAFALGAR HOUSE),

Project Engineer liaising with site/ design office/ client on Liverpool Street, London Broadegate Development, 11/05/1987 to 28/02/1988

4. TARMAC CONSTRUCTION,

Site Engineer setting out lines and levels on a housing project, March-April 1988, Bridgwater

5. A.E. FARR,

Site Engineer setting out reinforced concrete and holding down bolts on a new lesure swimming pool, April-June 1988, Croybe Bay

6. DOUGLAS CONSTRUCTION

Site Engineer setting out external works for a new Sainsbury's superstore, June-July 1988, Hereford

7. HERON HOMES

Site Engineer setting out foundations, roads and drainage on a housing project, July-August 1988, Southampton

8. HORTON CONSTRUCTION

Site Engineer setting out foundations on a housing project, August-September 1988, Weymouth

9. GROVERS OF SUSSEX LTD.

Site Engineer setting out foundations, roads and drainage on a housing project, September-November 1988, Durrington

10. ADAMS AND PARTRIDGE CIVIL ENGINEERING

10.1 Site Engineer setting out foundations, roads and drainage on a housing projectin Smalldole, December 1988 to May 1989

10.2 Site Engineer setting out groundworks, foundations and roads for the B&Q and Halfords superstore, Brighton.

11. NORWEST HOLST CONSTRUCTION

11.1 Site Engineer setting out reinforced concrete frame building (beams, columns and floors), May-July 1989, Winchester.

11.2 Site Engineer setting out reinforced concrete bridge structures, August 1989-February 1990, Bridge no. 1, Channel Tunnel, Folkstone.

12. HOULIHAN & CO.

Site Engineer setting out foundations and roads and drainage on a industrial estate project, 01/03/1990 to 07/03/1990, Welwyn Garden City

13. CRENDON STRUCTURES

Site Engineer setting out precast concrete elements of 2 no. industrial units, 11/03/1990 to 11/05/1990, Brighton

14. P.C.E. CONSTRUCTION

Site Engineer setting out precast concrete elements of a shopping centre, 13/05/1990 to 20/05/1990, Leicester

15. FONDEDILE CONSTRUCTION

Site Engineer precise monitoring of existing masonary sea retaining wall during underpinning operations, 20/05/1990 to 20/06/1990, Portsmouth harbour

16. COSTAIN CIVIL ENGINEERING

Site Engineer setting out roadworks and drainage, 01/07/1990 to 08/07/1990, Eastbourne, Pevensey-by-pass contract

17. WILTSHIRE

Site Engineer setting out reinforced concrete frame & foundations, 15/07/1990 to 26/08/1990, Dartford

18. WIMPEY CONSTRUCTION (UK) LTD.

Site Engineer carrying out site survey (of redundant cattle market) and setting out groundworks, foundations and drainage, 28/08/1990 to 14/10/1990, Haywards Heath

19. HYNES CONSTRUCTION LTD.

Site Engineer setting out reinforced concrete works, roads and drainage on Southern Water services contracts, 13/02/1991 to 05/05/1991, East Grinstead and Forest Row

20. RESINCREST CONSTRUCTION LTD.

Site Engineer setting out roadworks on a housing project, 08/05/1991 to 12/05/1991, Ford

21. HYNES CONSTRUCTION LTD.

Site Engineer setting out reinforced concrete works, roads and drainage on Southern Water services contracts, 03/06/1991 TO 01/09/1991, Wadhurst & Brede

22. CRENDON STRUCTURES,

Site Engineer setting out precast concrete units of a 3 storey building, 02/10/1991 to 23/10/1991, East London

23. DEAN & DYBALL CONSTRUCTION LTD.

Site Engineer setting out roadwords, drainage, earthworths and reinforced concrete structures, 11/02/1992 to 08/12/1992, Hampdon Park relief road, Eastbourne

24.1. FORWARD CONSTRUCTION LTD.

Site Engineer setting out holding down bolts positions for steel coloumns, 14/12/1992, Shearness Steel, Isle of Sheppy

24.1. NORTH KENT CONSTRUCTION LTD.

Site Engineer setting out holding down bolts positions for steel coloumns, 21/12/1992 to 27/12/1992, Shearness Steel, Isle of Sheppy

25. O.C. CONSTRUCTION

Site Engineer setting out housing foundations, 03/02/1993 to 23/02/1993, East Grinstead

26. DEAN & DYBALL CONSTRUCTION LTD.

Site Engineer setting out continuation of contract no. 23 above to completion of project, 17/05/1993 to 24/10/1993, Eastbourne

27. O.C. CONSTRUCTION LTD.

Site Engineer setting out housing foundations, 25/10/1993 to 05/12/1993, Maidenbower, East Grinstead and Sayers Common.

28. CARRYS CIVIL ENGINEERING

Site Engineer setting out foundations and holding down bolts positions for the steel frame of a new Sainsbury's store, 10/02/1994 to 30/06/1994, Chichester.

29. BIRSE CONSTRUCTION

Site Engineer setting out reinforced concrete structures on water treatment works, 02/07/1994 to 16/07/1994, St. Austell (Cornwall)

30. WIMPEY CONSTRUCTION

Site Engineer setting out roadworks, 22/07/1994 to 28/09/1994, A417 Brockworth by-pass, Gloucester

31. CAREY CIVIL ENGINEERING

Site Engineer setting out groundworks, piled foundations, holding down bolts and external works for a new Sainsbury's store, 01/12/1994 to 01/02/1995, Bell Green, London

32. KIER BUILD LTD.

Site Engineer setting out reinforced concrete elements on the extension works to the St. Richards hospital, 05/02/1995 to 12/03/1995, Chichester

33. EDMOND NUTTALL LTD.

Site Engineer setting out roadwords , 01/05/1995 to 20/05/1995, A2016 Erith/ Thamesmead Spine Road, London

34. EDMOND NUTTALL LTD.

Site Engineer setting out roadwords , 24/05/1995 to 17/06/1995, A406 Finchley North Circular Road, London

35. ARDMORE CONSTRUCTION

Site Engineer setting out piled foundations and reinforced concrete for a new block of flats, 20/06/1995 to 23/07/1995, Kensingron, London

36. LAING CONSTRUCTION

Site Engineer setting out piled foundations and reinforced concrete on the extension to the existing Conquest Hospital buildings, 24/07/1995 to 30/11/1995, Hastings

37. D.J. HIGGINS

Site Engineer setting out groundworks and roadworks on a housing project, 12/01/1996 to 19/01/1996, Crawley

38. CARRYS CIVIL ENGINEERING

Site Engineer setting out external works on a new Sainsbury's store, 15/02/1996 to 06/03/1996, Sittingbourne

39. BUILDSTONE LTD.

Site Engineer setting out external works on a new IKEA store, 18/03/1996 to 29/03/1996, West Thurrok

40. CAGNEYS LTD.

Site Engineer setting out a new service road, 04/04/1996 to 08/04/1996, Docklands, London

41. HALLAMSHIRE CONSTRUCTION

Site Engineer setting out piled foundations on a housing project, 01/05/1996 to 10/05/1996, Northampton

42. O.C. CONSTRUCTION

Site Engineer setting out roadworks on a housing project, 15/05/1996 to 17/05/1996, Maidenbower

43. WEALD CONSTRUCTION

Site Engineer setting out house foundations, 11/05/1996 to 14/05/1996, Rustington

44. LLEWELLYN CONSTRUCTION

Site Engineer setting out elements of an industrial unit, 11/05/1996 to 27/05/1996, Hailsham

45. O. C. CONSTRUCTION

Site Engineer setting out foundations and drainage on a housing project, 1/6/1996 to 6/7/1996, Orpington

46. COSTAIN ENGINEERING AND CONSTRUCTION

Site Engineer setting out piled foundations, drainage and external works of an industrial unit, 1/8/1996 to 24/11/1996, Eastbourne

47. J MURPHY LTD.

Site Engineer supervising of redevelopment of existing external works, 25/11/1996 to 14/1/1997, Terminal 3 Heathrow Airport

48. SURVEY CONSULT

Site Engineer land surveying the proposed route of the new railway link, 15/1/1997 to 22/1/1997, Channel Tunnel-London route

49. AMEY BUILDING

Site Engineer setting out piled foundations, drainage and external works of two new retail units, 24/1/1997 to 27/7/1997, East Croydon.

50. HYNES CONSTRUCTION

Site Engineer setting out reinforced concrete, pipeworks and drainage on Southern Water TreatmentWorks, 1/8/1997 to 3/10/1997, varied sites in Sussex

51. ASSOCIATED ASPHALT

Site Engineer setting out roadworks and drainage, 6/10/1997 to 26/11/1997, Billinghurst By-Pass

52. BUXTONS

Site Engineer setting out drainage and foundations on the extension works to the existing Royal Sussex Eye Hospital, 23/2/1998 to 12/4/1998, Brighton

53. BARNES & ELLIOT

Sub-agent/ site engineer, supervising and setting out of a new car park, leisure centreand Extension to the existing hotel complex, 14/4/1998 to 17/7/1998, Worth

54. JAMES LONGLEY

Site Engineer setting out heavy reinforced concrete structures, 20/7/1998 to 1/11/1998, Millennium seedbank, Ardingley

55. J. OSBOURNE

Site Engineer setting out two new car parks, 1/11/1998 to 6/11/1998, Horsham

56. T. A. MORRIS LTD.

Site Engineer setting out external works of a new built industrial estate, 8/11/1998 to 29/11/1998, Orpington

57. O’ROURKE

Site Engineer setting out reinforced concrete structure, 31/11/1998 to 9/12/1998, Southampton

58. ASHFORD CONSTRUCTION

Site Engineer and General Foreman on a new industrial unit, 4/1/1999 to 23/7/1999, Brighton

59. CLUGSTON CONSTRUCTION LTD.

Site Engineer setting out foundations and holding down bolts on a new industrial unit, 26/7/1999 to 21/8/1999, Gosport

60. WATES CONSTRUCTION LTD.

Site Engineer setting out foundations and drainage on new school accommodation blocks, 23/8/1999 to 14/1/2000, Christ’s Hospital School, Horsham

61. COINFORD CONSTRUCTION LTD.

Site Engineer setting out foundations and associated works on a housing project, 18/1/2000 to 11/2/2000, Little Venice housing project, Eastbourne

62. BENSON

Site Engineer setting out a featured swimming pool and external works for the extension to Brighton College, 28/2/2000 to 10/3/2000, Brighton

63. AMEC

Site Engineer surveying elements of the main airport runway like electrical chambers, 13/3/2000 to 29/3/2000, Gatwick Airport

64. EDMOND NUTTALL LTD.

Site Engineer setting out and supervising installation of steel plates/ brackets to strengthen the structure of the existing reactors, 28/4/2000 to 28/7/2000, Dungeness A Power Station

65. TRY ACCORD

Site Engineer setting out pipework in new water treatment works, 1/8/2000 to 13/8/2000, Reigate

66. MILLER CIVIL ENGINEERING

Site Engineer setting out roadworks and earthworks, 14/8/2000 to 17/11/2000, Polegate by-pass

67. MILLER CIVIL ENGINEERING

Site Engineer setting out roadworks and earthworks, 09/01/2001 to 15/01/2001, Polegate by-pass

68. COWLIN CONSTRUCTION

Site Engineer setting out foundations, drainage, roadworks and associated QA documentation, 22/01/2001 to 02/02/2001, Tidworth, Hampshire

69. JEFFREY OSBORNE

Site Engineer setting out external works of a refurbishment project of a historic school building, 02/02/2001 to 27/04/2001, Winchester

70. AMEC

Site Engineer setting out roadworks on the A3 roadworks widening projec, 27/04/2001 to 08/06/2001. East London

71. SUNLEY TURRIF

Project / Site Engineer supervising / setting out a new industrial unit, holding down bolts foundation work and drainage, 08/06/2001 to 28/07/2001, West Malling

72. BENSON

Site Engineer setting out groundwork, reinforced concrete foundation for a deep perimeter retaining wall and a new car park, 28/07/2001 to 10/08/2001, Winchester

73. BUILDSTONE LTD.

Site Engineer setting out reinforced concrete foundations and earthworks on the new Rolls Royce factory, 10/08/2001 to 28/09/2001, Westhampnett (Chichester)

74. MARK HUGHES LTD.

Site Engineer setting out foundations and holding down bolts for the extension of an existing factory, 05/10/2001 to 09/11/2001, Chichester

75. TOPOGRAPHICAL SURVEY LTD.

Site Engineer setting out small structures on a lane rental job (M27), 09/11/2001 to 21/11/2001, Southampton

76. ARDMORE CONSTRUCTION LTD.

Site Engineer setting out groundworks on two different sites, one on a block of flats project in South Croydon (reinforced concrete foundations and structure, roads and drainage) and the other in Central Croydon setting out reinforced concrete foundations with holding down bolts and drainage on the extension to an existing shopping centre, 20/11/2001 to 15/02/2002, Central and South Croydon

77. J. SISK CONSTRUCTION

Site Engineer setting out lines and levels for cladding/curtain walling and internal works of the extension to the existing Hilton Hotel, 08/03/2002 to 15/03/2002, Gatwick Airport

78. MOWLEM

Site Engineer setting out external works on the renovation of Staines Town Hall frontage, 28/03/2002 to 31/07/2002, Staines

79. MARK HUGHES GROUND WORKS

Site Engineer setting out external works, i.e. new kerbed islands, new staff car park and associated drainage works to extension to an existing Tesco store, 02/08/2002 to 12/09/2002, Portsmouth

80. WARINGS CONTRACTORS LIMITED

Site Engineer setting out R.C. works on a new multi-storey building on the University Of Portsmouth site, 17/09/2002 to 20/09/2002, Portsmouth

81. HAMBLE CONSTRUCTION LTD

Site Engineer setting out R.C. works on a new block as an extension to existing old peoples’ rest home, 10/10/2002 to 12/03/2002, Southampton

82. CARTER LAUREN CONSTRUCTION LTD.

Site Engineer setting out piled foundations for a new pub, 03/04/2003 to 11/04/2003, Blackwater

83. MANN CONSTRUCTION LTD

Site Engineer setting out heavy reinforced concrete structures for a new office block development, 12/04/2003 to 11/05/2003, Brighton

84. MANN CONSTRUCTION LTD.

Site Engineer setting out R.C. structures for new train service depot, 12/05/2003 to 18/06/2003, Brighton Station

85. LAING O’ROURKE PLC

Site Engineer setting out R C structures on the new Heathrow Terminal 5, 19/08/03 to 16/04/04

86. LAISHLEY LTD.

Site Engineer setting out foundations for a new medical centre, 02/09/2004 to 06/10/2004, Horley

87. RAYMOND BROWN (CONSTRUCTION) LTD.

Site Engineer setting out roads, drainage, car park and associated earthworks on a new car park project, 20/10/2004 to 23/12/2004, University of Sussex

88. FITZPATRICK CONSTRUCTION LTD.

Site Engineer setting out out industrial units with all associated internal and external works, 17/01/2005 to 24/06/2005, Bexhill

89. ARDMORE CONSTRUCTION LTD.

Site Engineer setting out groundworks and R C structures, 10/08/2005 to 18/11/2005, Eastbourne

90. ROCK & ALLUVIUM LTD.

Site Engineer setting out concrete piles, 18/12/2005 to 25/12/2005, Portsmouth

91. Mitcheleson Construction

Site Engineer setting out groundworks and R.C. work to an existing hospital building, 16/01/06 to 05/02/06, Horsham

92. Miller Construction

Site Engineer setting out and carrying out engineering Q/A and supervision on two R.C. buildings and associated external works, 06/02/06 to 30/04/06; Whitely

93. Oakhurst Construction

Site Engineer setting out concrete piles, 04/06/06 to 30/06/06, Brighton

94. Balfour Beatty Construction

Site Engineer supervising subcontractor’s engineering work on a R.C. frame, 01/07/06 to 14/10/06, Brighton

95. Frankis Solutions Ltd.

Site Engineer and Agent; carrying out setting out and running the site to construct pile and beam combination foundation for a housing development project, 15/01/07 to 05/04/07, Shoreham-by-sea

96. Drivepoint Contractors Ltd

Site Engineer setting out foundations and drainage on a housing project, 11/04/07 to 20/04/07, Mannings Heath

97. Norwest Holst Construction Ltd.

Site Engineer setting out foundations and drainage on a housing project, 24/04/07 to 29/06/07; Brighton

98. Alysian Homes

Site Manager/ Engineer on a new private housing development site, supervising and setting out of the initial site set up, 17/08/07 to 04/09/07, Tunbridge Wells

99. Laing O'Rourke

Site Engineer setting out piles, R.C. caps and colums, groundworks and drainage, 26-11-07 to 22-12-07, Hastings

100. Reilly Civil Engineering

Site Engineer setting out housing foundations, drainage, and roadworks on three different sites, 11-01-08 to 02-05-08, Caterham, Hassocks,Eastbourne

101. Bam Nuttall

Section Engineer mainly setting out R.C. works on a new Composting plant, 04-08-08 to 23-12-08, Whitesmith

102. Bam Nuttall

Site Engineer setting out finishing work as per above contract number 101, 24-04-09 to 29-05-09, Whitesmith

103. Bam Nuttall

Site Engineer setting out , roadworks refurbishment including lane extension, drainage and new lamp columns, 13-07-09 to 23-10-09, A3 Esher by-pass

104. Ceecom Construction Ltd.

Site Engineer setting out an R.C. frame and drainage for a new private house, 04-09-11 to 31-09-11, Wibling Farm, Graffham

105. Avon Construction Ltd.

Site Agent supervising construction of a new UV Plant, 19-09-11 to 03-10-11, Woodgreen WTW

106. Gallagher Civil Engineering Ltd

Site Engineer setting out grid lines for holding down bolts and light column positions on a new Sainsbury's store, 07/10/11 to 16/10/11, Southampton

Site engineer setting out drainage and ground levels for a new car park in Mote Park, 17/10/11 to 24/10/11, Maidstone

Site engineer setting out R. C. floor and kerbs on a new Sainsbury's store, 21/12/11 to 07/01/12, Southmpton

107. G. C. L

Site Engineer on a new housing development at an old nursing home site setting up the initial site controls and site setting out roads, drainage, and R. C. foundations on a three blocks of residential flats (total of 93), 06/02/12 to 22/04/12, Brighton

108. Knight Build Ltd.,

Site Engineer on two new schools setting out external works (kerbs, drainage, earthworks), 26/06/12 to 17/08/12, Shoreham-by-Sea and Lancing

109. Bam Nuttall (c/o Keyman),

Site Engineer on construction of a new R.C. Railway bridge railway bridge, setting out R.C. abutments and 30 bearings to receive 14 number 30m long precast prestressed concrete beams, 19/12/13 to 07/03/14, Haywards Heath

110. Built Solutions Ltd. (c/o Randstad),

Site Engineer on the extention to an existing school, 17/ 03/14 to 21/03/14, Eastbourne

111. HOCHTIFF TAYLOR WOODROW Joint Venture (c/o Keyman)

Site Engineer setting out about 90% of the bridges structures (about 21 structures), all the fencing, plantation areas and drainage, 25/03/14 to 18/12/15, Hastings

112. Laing O'Rourke (c/o Minstrell),

Site Engineer on the redevelopment of the Brighton Royal Sussex County Hospital, 11/04/16 to 14/10/16 - Brighton

113. J T Mackley (c/o Randstad)

Site Engineer on monitoring river bank retaining wall and various surveys of existing concrete lines in East Farleigh during refurbishment of the river lock (RC), 31/10/16 to 03/03/17 – East Farleigh near Maidstone

114. Jacksons (c/o Randstad)

Site Engineer on setting out external groundworks including pavings, drainage and railings on Maidstone gyratory, 16/03/17 to 28/04/17, Maidstone

115. Laing O'Rourke (c/o Minstrell),

Site Engineer on the redevelopment of the Brighton Royal Sussex County Hospital, 02/10/17 to 31/12/17, Brighton

116. Buckingham group (c/o Fawkes and Reece),

Site Engineer on A27 Monks Farm project setting out roadworks, 29/06/21 to 12/07/21, Lancing

117. R&W Civil Engineering (c/o Fawkes and Reece),

Site Engineer carrying out topographic surveys of trial pits and setting out roadworks (kerb Lines and drainage), 23/07/21 to 05/08/21, M25, Junction 13

118. Van Oord Marine Integrity (c/o RTL Group Ltd)

Surveyor surveying re-shingling operations re-shingling operations of the eroded Lydd beach by GPS and sending the results in cad and excel formats to the head office, 19/08/21 to 10/09/21, Lydd

119. JT Mackley (c/o Randstad),

Site Engineer setting out steel circular piles on a new jetty construction, 03/12/21 to 08/12/21, Northfleet

120. Joseph Gallegher (c/o Randstad),

Site Engineer setting out heavy rc base and slab, and micro-tunnelling for a 600 dia pipe (56m long) for a new waste water treatment pumping station, 18/07/22 to 03/09/22, Ashford

121. Jacksons Civil Engineering (c/o Solution),

Site Engineer setting out roadworks, drainage, earthworks and a new Pumping station, 10/04/23 to 13/10/23, Burgess Hill